link to adobe

If you require Adobe Reader click on the link above to download it for free

Hydro Power Survey Equipment

Key Features

  • Easy Installation
  • Data in Digital Format Excel etc
  • 32 Bit Processor
  • Vented System (with automatic barometric adjustment)
  • Very Accurate Vented Depth Transducer
  • Unattended Measurement at Remote Sites

Description

Our Dipper P Water Level Logger allows unattended continuous measurement of water level, particularly useful in remote sites, with its own internal power the Dipper P can remain on site for many months thus providing data to assist viability studies. Information for discharge calculations can be obtained with a minimum of costly site visits.

Easily moved from site to site with a minimum of installation, the Dipper P Logger being a vented system, needs no barometric adjustment ie it knows exactly at what height it is sited.

Dipper P is now extensively used at proposed hydropower sites.

Download Specification (PDF Format)

Leaflet (850KB)